Design, Supply and Construction of 4.37km Medium Voltage Lines,
0.29km Low Voltage Lines and installation of two Distribution Transformers
in Birinzi Village. Budget:USD: 87643.54
The Procurement of Plant Design, Supply and Installation of Medium Voltage
Networks and Last Mile Consumer Connections: LOT 4 - Eastern Service
Territory (Kaliro and Environs) - REA-ADB/WRKS/17-18/00070/004.
Construction of Design, Supply and Installation of 33KV Lines and
Associated Low Voltage Networks for Lot 1: Fast Track Line 3(Wandi-Yumbe-Moyo)
Contract No.REA• ERTHI/WRKS/18-19/00544/a
Survey and Design including (Geo Reafference and plotting line Route,
Profile Generation and power Line Design)for 204.SSkm Medium Voltage Lines, 484. 79km Low Voltage Lines
and 149 Distribution Transformers in Wakiso, Lwengo, Bukomansimbi and
Kiruhura Districts. Budget:USD 85,524
we employ the highest ethical standards and believe that our continued success is based upon sustaining
the relationships that keep our business growing. We believe that open and honest communication is vital
to the lasting success of the company.
we believe that an open culture characterized by mutual respect, sharing of ideas and a
commitment to common goals contributes to the overall productivity of our Company.
Our philosophy is that each team member plays an important role in our company by providing
individual expertise and a distinctive perspective to each project that they are involved in.
In providing professional service we are dedicated to competence, dependability and excellence.
We believe that our projects are a reflection of who we are as a company.
we are dedicated to not only achieving, but exceeding, client expectations.
Through a strong commitment to the above values, Dyut Engineering Consults strives to set ourselves
above the rest.